Design Specifications
EC U-Drain is designed according to BS 8110 : Part 1 : 1985 with the following design criterias:
  • Uniform live load of 10KN/m2
  • Concrete grade = 30N/mm2
  • Minimum reinforcement cover = 25mm ~ 35mm
  • Angle of internal friction of earth = 30°
  • Bulk density of compacted earth backfill = 19KN/m3
  • Granular backfill (see Figure 1) is recommended for drainage layer behind wall

Installation of the U-Drain
  • The U-Drain/ Box Culvert should be laid on compacted sand bedding to the required level.
  • Area where soil condition is bad, excavate deeper and replace with suitable material beneath the sand bedding, according to the engineer's design requirements for the foundation.
  • Gap at joining area should be filled with cement mortar.
  • Back of weepholes should be filled with suitable filter material.

Handling of the U-Drain
  • Weepholes are to be utilized as lifting holes for handling and installing the
    U-Drain/ Box Culvert.
  • A Lifting Beam is to be used for lifting the U-Drain/ Box Culvert to prevent excessive stress to the legs. (see Figure 2)
  • All U-Drains/ Box Culverts are to be placed or stacked on level and firm ground at all times on site.